01 / GANTRY & HOARDING
A heavy-duty foundation.
A heavy-duty pavement gantry provided a loading platform and hoist landing. Full hoarding was designed, supplied and fitted by our team.
CASE STUDY / LONDON
Planning and design oversight for a complex scaffolding installation bringing together loading, lifting and suspended access.

THE PROJECT
We oversaw the planning and design for this challenging project, bringing several different elements together in one installation. Our team on site did an exceptional job delivering a scaffold with loading, lifting and suspended access requirements.
01 / GANTRY & HOARDING
A heavy-duty pavement gantry provided a loading platform and hoist landing. Full hoarding was designed, supplied and fitted by our team.
02 / RUNWAY SYSTEM
The installation included a Nico runway system with a push trolley and a 250 kg cable hoist.
03 / PASSENGER & GOODS HOIST
A 1,500 kg passenger/goods hoist was installed up off the heavy-duty gantry.
04 / SUSPENDED SCAFFOLD
The entire rear of the scaffold was suspended above the lower roofs, using chemical-fix ties into the walls.
PROJECT PLANNING & DESIGN
Our involvement included overseeing the project planning and scaffolding design.
Select a drawing to view it at full size.
THE PROJECT LOCATION
The Novello Theatre
Aldwych, London, WC2B 4LD
Carried out in May 2025.
Explore our London coverageEXPLORE ANOTHER PROJECT
Queen Victoria StreetYOUR NEXT PROJECT