CASE STUDY / LONDON

74–82 Queen
Victoria Street.

Public protection and scaffold access for redecoration and refurbishment works.

The completed gantry and tied independent scaffold along Queen Victoria Street

01 / THE REQUIREMENT

Protection below.
Access above.

The project required a public protection gantry along a busy walkway, with a tied independent scaffold erected above. The scaffold provided access for redecoration and refurbishment works.

02 / THE CHALLENGE

A demanding
urban setting.

The busy walkway and surrounding driveways made this a logistically challenging installation. The setting brought the practical demands of public access and scaffold erection together on one project.

03 / THE DELIVERY

Executed by
our team on site.

Our site team erected the protection gantry and tied independent scaffold in this challenging setting. It was a fantastic project to carry out, and a strong example of the workmanship and execution of our team on site.

THE PROJECT LOCATION

Queen Victoria Street,
London.

74–82 Queen Victoria Street
EC4N 4SJ

Carried out in May 2023.